MZR Construction Inc handles interior and exterior house painting in Massachusetts. Ten years of experience on walls, ceilings, trim, doors and full exterior repaints. Preparation comes first, because paint only lasts as long as what is under it.
Paint is the easy part. Scraping, patching, sanding, caulking and priming are what decide whether the finish holds or peels. A cheap paint job is almost always a skipped preparation job. That shows up in the second Massachusetts winter, not the first week.
MZR Construction Inc preps before painting, inside the house and outside. Walls get patched, trim gets sanded, bare exterior wood gets primed and every surface gets cleaned. The finish coats go on after that work is done, not instead of it.
Scraping, patching, sanding, caulking and priming happen before a single finish coat.
Floors, furniture and landscaping masked and protected before any can gets opened.
Two finish coats where two are needed, not one coat with the primer counted as the second.
Masking pulled, floors cleaned and paint stored, so you walk into a finished house not a job site.
A look at the real work behind the estimates. Click any image to see it full size.
The difference between a paint job that lasts eight years and one that peels in two is not the paint. It is what happened before the first coat went on.
Get Started Today Get Your Free Painting EstimateScraping, patching and priming happen first, because a finish coat over loose paint fails.
Floors, furniture, fixtures and landscaping get masked and protected before any can gets opened.
The same company handles siding, trim and doors, so damaged wood gets repaired instead of painted over.
We walk the rooms or the exterior, note every repair and confirm the colors and sheens with you.
The estimate lists the surfaces, the number of coats and the products, so nothing gets assumed later.
Scraping, patching, sanding, caulking and priming all happen before a single finish coat goes on.
The crew paints, pulls the masking, cleans up and walks the finished work with you at the end.
Tell us what needs painting and where. You get a free written estimate with the surfaces, the prep, the number of coats and the price in one document.
No obligation. 2 hour response.